49 CFR pipeline compliance deadline calendar
Every dated obligation in 49 CFR Parts 190–199 — and in Part 40, which §199.101 pulls in for drug and alcohol testing — plus the rule effective dates, comment periods, and appeal windows that change them. Each entry says which it is, because an effective date is not a deadline and a direct final rule’s date is not a promise.
https://api.kondwit.com/calendar-feed/public/49cfr.icsA live subscription, not a download. Outlook, Google Calendar, and Apple Calendar re-fetch it on their own schedule, so corrections and retractions reach you without you doing anything.
62 entries · generated 9/2/2026, 4:13:18 AM UTC
Compliance Deadline16
A date written into the codified regulation text. This is an obligation: something an operator must have done.
- Binding — codified 49 CFR
49 CFR §40.111
The summary must be sent by January 20 of each year for July 1 through December 31 of the prior year.
A recurring assessment obligation, due January 20 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §40.111
The summary must be sent by January 31 of each year for July 1 through December 31 of the prior year.
A recurring assessment obligation, due January 31 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §192.12
No later than March 13, 2027, an operator must complete baseline risk assessments on all its wells (including wellhead assemblies).
A assessment obligation with a fixed date, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §191.11
This report must be submitted each year, not later than March 15, for the preceding calendar year.
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §191.17
LNG.Each operator of a liquefied natural gas facility must submit an annual report for that system on DOT Form PHMSA 7100.3-1 This report must be submitted each year, not later than March 15, for the preceding calendar year, except that for the 2010 reporting year the report must be submitted by June 15, 2011.
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §191.17
This report must be submitted each year, no later than March 15, for the preceding calendar year.
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §191.29
The information required in paragraph (a) of this section must be submitted each year, on or before March 15, representing assets as of December 31 of the previous year.
A recurring assessment obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §199.229
Each large operator (having more than 50 covered employees) must submit an annual MIS report to PHMSA of its alcohol testing results using the MIS form and instructions as required by 49 CFR part 40 (at § 40.26 and appendix H to part 40), not later than March 15 of each year for the prior calendar year (January 1 through December 31).
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §199.119
Each large operator (having more than 50 covered employees) must submit an annual Management Information System (MIS) report to PHMSA of its anti-drug testing using the MIS form and instructions as required by 49 CFR part 40 (at § 40.26 and appendix H to part 40), not later than March 15 of each year for the prior calendar year (January 1 through December 31).
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §191.17
This report must be submitted each year, not later than March 15, for the preceding calendar year.
A recurring report obligation, due March 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §195.49
An operator must submit the annual report by June 15 each year, except that for the 2010 reporting year the report must be submitted by August 15, 2011.
A recurring report obligation, due June 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §195.61
This information must be submitted each year, on or before June 15, representing assets as of December 31 of the previous year.
A recurring assessment obligation, due June 15 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §40.111
The summary must also be sent by July 20 of each year for January 1 through June 30 of the current year.
A recurring assessment obligation, due July 20 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §40.111
It must be sent by July 31 of each year for January 1 through June 30 of the current year.
A recurring assessment obligation, due July 31 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §40.111
The summary must be sent by January 20 of each year for July 1 through December 31 of the prior year.
A recurring assessment obligation, due January 20 every year, codified in the regulation text.
- Binding — codified 49 CFR
49 CFR §40.111
The summary must be sent by January 31 of each year for July 1 through December 31 of the prior year.
A recurring assessment obligation, due January 31 every year, codified in the regulation text.
Rule Effective Date29
The date a published rule’s amendments take effect. Not itself a deadline — it is when the requirement changes.
- Quasi-binding — Federal Register
91 FR 22029
Pipeline Safety: Standards Update-ASTM A333/A333M
2026-08044 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22004
Pipeline Safety: Standards Update-ASTM F2620
2026-08045 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22021
Pipeline Safety: Standards Update-ASTM D2513
2026-08046 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22001
Pipeline Safety: Standards Update-ASTM F2767
2026-08047 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22018
Pipeline Safety: Standards Update-ASTM F1973
2026-08048 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 21997
Pipeline Safety: Standards Update-ASTM F1055
2026-08049 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22043
Pipeline Safety: Standards Update-MSS SP-75
2026-08050 — the date this rule's amendments take effect (49 CFR Parts 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22025
Pipeline Safety: Standards Update-NACE SP0502
2026-08051 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 21993
Pipeline Safety: Standards Update-NACE SP0206
2026-08052 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal RegisterWithdrawn — never took effect
91 FR 22039
Pipeline Safety: Standards Update-ASME B31.4
2026-08053 — this rule did NOT take effect.
withdrawn 2026-07-31 by 2026-15579 — never took effect
- Quasi-binding — Federal Register
91 FR 22008
Pipeline Safety: Standards Update-ASTM A372/A372M
2026-08069 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 21990
Pipeline Safety: Standards Update-ASTM D2564
2026-08071 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 21986
Pipeline Safety: Standards Update-NFPA 58
2026-08072 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22032
Pipeline Safety: Standards Update-ASTM A53/A53M
2026-08073 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 22012
Pipeline Safety: Standards Update-NFPA 59
2026-08075 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48301
Pipeline Safety: Standards Update-ASTM D2564
2026-15568 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48304
Pipeline Safety: Standards Update-ASTM F1973
2026-15570 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48300
Pipeline Safety: Standards Update-NFPA 58
2026-15571 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48301
Pipeline Safety: Standards Update-NFPA 59
2026-15572 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48305
Pipeline Safety: Standards Update-NACE SP0502
2026-15573 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48303
Pipeline Safety: Standards Update-NACE SP0206
2026-15574 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48307
Pipeline Safety: Standards Update-MSS SP-75
2026-15575 — the date this rule's amendments take effect (49 CFR Parts 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48301
Pipeline Safety: Standards Update-ASTM F2620
2026-15576 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48302
Pipeline Safety: Standards Update-ASTM F2767
2026-15577 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48302
Pipeline Safety: Standards Update-ASTM D2513
2026-15578 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48302
Pipeline Safety: Standards Update-ASTM F1055
2026-15580 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48300
Pipeline Safety: Standards Update-ASTM A372/A372M
2026-15581 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48304
Pipeline Safety: Standards Update-ASTM A333/A333M
2026-15583 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
- Quasi-binding — Federal Register
91 FR 48304
Pipeline Safety: Standards Update-ASTM A53/A53M
2026-15584 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.
Appeal Window17
The §106.110 window to petition for reconsideration of a final rule.
- Procedural
106.110
Hazardous Materials: Reducing Burdens on Domestic Aerosol Shippers
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reducing Costs to Domestic Shippers and Carriers of Limited Quantities
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reducing Undue Paperwork Burdens to Domestic Carriers
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Remove Redundant List of U.S. EPA CERCLA Hazardous Substances
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reducing Burdens by Allowing Continued Use of Department of Transportation Special Permit Packagings
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Improving Efficiencies for Special Permits and Approvals Renewals
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Modernizing Payments To and From America's Bank Account
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reducing Recordkeeping Requirements for Domestic Carriers
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reduce Training Burdens for America's Farmers
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Removing Burdensome Rail Reporting Requirements
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Adoption of Department of Transportation Special Permits 12412 and 11646 Into the Hazardous Materials Regulations
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Adoption of Department of Transportation Special Permit 21287
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Adoption of Department of Transportation Special Permit 21379
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Adoption of Department of Transportation Special Permit 14175
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Adoption of Department of Transportation Special Permit 21478
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Reducing Burdens on Domestic Companies Using Battery-Powered Equipment in Trades
The window to petition for reconsideration closes. Rule published 2026-08-04.
- Procedural
106.110
Hazardous Materials: Allowing Fireworks Certification Agencies (FCAs) To Approve Professional Fireworks
The window to petition for reconsideration closes. Rule published 2026-08-07.
Get the changes as they happen
The calendar tells you the dates. The daily brief tells you what moved them — new rules, withdrawals, interpretations, and enforcement, each with the citation.
Get regulation updates
New enforcement analysis, regulation guides, and compliance insights. No spam.
Or email guide@kondwit.com with a regulation question and get a cited answer back — no account needed.