49 CFR pipeline compliance deadline calendar

Every dated obligation in 49 CFR Parts 190–199 — and in Part 40, which §199.101 pulls in for drug and alcohol testing — plus the rule effective dates, comment periods, and appeal windows that change them. Each entry says which it is, because an effective date is not a deadline and a direct final rule’s date is not a promise.

Subscribe in your calendarhttps://api.kondwit.com/calendar-feed/public/49cfr.ics

A live subscription, not a download. Outlook, Google Calendar, and Apple Calendar re-fetch it on their own schedule, so corrections and retractions reach you without you doing anything.

62 entries · generated 9/2/2026, 4:13:18 AM UTC

Compliance Deadline16

A date written into the codified regulation text. This is an obligation: something an operator must have done.

  • Binding — codified 49 CFR

    49 CFR §40.111

    The summary must be sent by January 20 of each year for July 1 through December 31 of the prior year.

    A recurring assessment obligation, due January 20 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §40.111

    The summary must be sent by January 31 of each year for July 1 through December 31 of the prior year.

    A recurring assessment obligation, due January 31 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §192.12

    No later than March 13, 2027, an operator must complete baseline risk assessments on all its wells (including wellhead assemblies).

    A assessment obligation with a fixed date, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §191.11

    This report must be submitted each year, not later than March 15, for the preceding calendar year.

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §191.17

    LNG.Each operator of a liquefied natural gas facility must submit an annual report for that system on DOT Form PHMSA 7100.3-1 This report must be submitted each year, not later than March 15, for the preceding calendar year, except that for the 2010 reporting year the report must be submitted by June 15, 2011.

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §191.17

    This report must be submitted each year, no later than March 15, for the preceding calendar year.

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §191.29

    The information required in paragraph (a) of this section must be submitted each year, on or before March 15, representing assets as of December 31 of the previous year.

    A recurring assessment obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §199.229

    Each large operator (having more than 50 covered employees) must submit an annual MIS report to PHMSA of its alcohol testing results using the MIS form and instructions as required by 49 CFR part 40 (at § 40.26 and appendix H to part 40), not later than March 15 of each year for the prior calendar year (January 1 through December 31).

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §199.119

    Each large operator (having more than 50 covered employees) must submit an annual Management Information System (MIS) report to PHMSA of its anti-drug testing using the MIS form and instructions as required by 49 CFR part 40 (at § 40.26 and appendix H to part 40), not later than March 15 of each year for the prior calendar year (January 1 through December 31).

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §191.17

    This report must be submitted each year, not later than March 15, for the preceding calendar year.

    A recurring report obligation, due March 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §195.49

    An operator must submit the annual report by June 15 each year, except that for the 2010 reporting year the report must be submitted by August 15, 2011.

    A recurring report obligation, due June 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §195.61

    This information must be submitted each year, on or before June 15, representing assets as of December 31 of the previous year.

    A recurring assessment obligation, due June 15 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §40.111

    The summary must also be sent by July 20 of each year for January 1 through June 30 of the current year.

    A recurring assessment obligation, due July 20 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §40.111

    It must be sent by July 31 of each year for January 1 through June 30 of the current year.

    A recurring assessment obligation, due July 31 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §40.111

    The summary must be sent by January 20 of each year for July 1 through December 31 of the prior year.

    A recurring assessment obligation, due January 20 every year, codified in the regulation text.

  • Binding — codified 49 CFR

    49 CFR §40.111

    The summary must be sent by January 31 of each year for July 1 through December 31 of the prior year.

    A recurring assessment obligation, due January 31 every year, codified in the regulation text.

Rule Effective Date29

The date a published rule’s amendments take effect. Not itself a deadline — it is when the requirement changes.

  • Quasi-binding — Federal Register

    91 FR 22029

    Pipeline Safety: Standards Update-ASTM A333/A333M

    2026-08044 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22004

    Pipeline Safety: Standards Update-ASTM F2620

    2026-08045 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22021

    Pipeline Safety: Standards Update-ASTM D2513

    2026-08046 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22001

    Pipeline Safety: Standards Update-ASTM F2767

    2026-08047 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22018

    Pipeline Safety: Standards Update-ASTM F1973

    2026-08048 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 21997

    Pipeline Safety: Standards Update-ASTM F1055

    2026-08049 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22043

    Pipeline Safety: Standards Update-MSS SP-75

    2026-08050 — the date this rule's amendments take effect (49 CFR Parts 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22025

    Pipeline Safety: Standards Update-NACE SP0502

    2026-08051 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 21993

    Pipeline Safety: Standards Update-NACE SP0206

    2026-08052 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal RegisterWithdrawn — never took effect

    91 FR 22039

    Pipeline Safety: Standards Update-ASME B31.4

    2026-08053 — this rule did NOT take effect.

    withdrawn 2026-07-31 by 2026-15579 — never took effect

  • Quasi-binding — Federal Register

    91 FR 22008

    Pipeline Safety: Standards Update-ASTM A372/A372M

    2026-08069 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 21990

    Pipeline Safety: Standards Update-ASTM D2564

    2026-08071 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 21986

    Pipeline Safety: Standards Update-NFPA 58

    2026-08072 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22032

    Pipeline Safety: Standards Update-ASTM A53/A53M

    2026-08073 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 22012

    Pipeline Safety: Standards Update-NFPA 59

    2026-08075 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48301

    Pipeline Safety: Standards Update-ASTM D2564

    2026-15568 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48304

    Pipeline Safety: Standards Update-ASTM F1973

    2026-15570 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48300

    Pipeline Safety: Standards Update-NFPA 58

    2026-15571 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48301

    Pipeline Safety: Standards Update-NFPA 59

    2026-15572 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48305

    Pipeline Safety: Standards Update-NACE SP0502

    2026-15573 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48303

    Pipeline Safety: Standards Update-NACE SP0206

    2026-15574 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48307

    Pipeline Safety: Standards Update-MSS SP-75

    2026-15575 — the date this rule's amendments take effect (49 CFR Parts 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48301

    Pipeline Safety: Standards Update-ASTM F2620

    2026-15576 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48302

    Pipeline Safety: Standards Update-ASTM F2767

    2026-15577 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48302

    Pipeline Safety: Standards Update-ASTM D2513

    2026-15578 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48302

    Pipeline Safety: Standards Update-ASTM F1055

    2026-15580 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48300

    Pipeline Safety: Standards Update-ASTM A372/A372M

    2026-15581 — the date this rule's amendments take effect (49 CFR Parts 192). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48304

    Pipeline Safety: Standards Update-ASTM A333/A333M

    2026-15583 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

  • Quasi-binding — Federal Register

    91 FR 48304

    Pipeline Safety: Standards Update-ASTM A53/A53M

    2026-15584 — the date this rule's amendments take effect (49 CFR Parts 192, 195). An effective date is not itself a compliance deadline.

Appeal Window17

The §106.110 window to petition for reconsideration of a final rule.

  • Procedural

    106.110

    Hazardous Materials: Reducing Burdens on Domestic Aerosol Shippers

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reducing Costs to Domestic Shippers and Carriers of Limited Quantities

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reducing Undue Paperwork Burdens to Domestic Carriers

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Remove Redundant List of U.S. EPA CERCLA Hazardous Substances

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reducing Burdens by Allowing Continued Use of Department of Transportation Special Permit Packagings

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Improving Efficiencies for Special Permits and Approvals Renewals

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Modernizing Payments To and From America's Bank Account

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reducing Recordkeeping Requirements for Domestic Carriers

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reduce Training Burdens for America's Farmers

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Removing Burdensome Rail Reporting Requirements

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Adoption of Department of Transportation Special Permits 12412 and 11646 Into the Hazardous Materials Regulations

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Adoption of Department of Transportation Special Permit 21287

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Adoption of Department of Transportation Special Permit 21379

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Adoption of Department of Transportation Special Permit 14175

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Adoption of Department of Transportation Special Permit 21478

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Reducing Burdens on Domestic Companies Using Battery-Powered Equipment in Trades

    The window to petition for reconsideration closes. Rule published 2026-08-04.

  • Procedural

    106.110

    Hazardous Materials: Allowing Fireworks Certification Agencies (FCAs) To Approve Professional Fireworks

    The window to petition for reconsideration closes. Rule published 2026-08-07.

Get the changes as they happen

The calendar tells you the dates. The daily brief tells you what moved them — new rules, withdrawals, interpretations, and enforcement, each with the citation.

Get regulation updates

New enforcement analysis, regulation guides, and compliance insights. No spam.

Or email guide@kondwit.com with a regulation question and get a cited answer back — no account needed.

Sources: the codified 49 CFR text (eCFR), Federal Register rules and their post-publication lifecycle, and regulations.gov docket data. Freshness for every feed is public on the data status board.

This calendar is a research aid, not legal advice, and it is not a substitute for reading the regulation. Only the codified text and the Federal Register are authoritative. eCFR Title 49

Terms·Privacy·© 2026 KONDWIT
49 CFR Pipeline Compliance Deadline Calendar — KONDWIT